3 results
The objective is to test, validate, obtain regulatory approval for, and deploy at home, a closed-loop Control-to-Range (CTR) system comprising two algorithmic components: a Safety Supervision Module (SSM) and an automated Range Correction Module (…
The objective is to sequentially test, validate, obtain regulatory approval for, and deploy at home, a closed-loop Control-to-Range (CTR) system comprising two algorithmic components: a Safety Supervision Module (SSM) and an automated Range…
Primary objectives:• To evaluate the safety and tolerability of BMS-914143 as measured by the frequency of SAEs and discontinuations due to AEs;• To assess the HBeAg seroconversion rate at 24 weeks off treatment (Week 72).Secondary objective• To…